RE-BUILDING THE INDIAN Part 4 All photos are the property of Backstage Distributions. ©Copyright 2001. Backstage | Part1 | Part2 | Part3 |My History |Previous |
As of March 31, 2001 I have done 250 miles on it even with snowbanks everywhere. I've decided to change the charging system over to 12 volt and to install an alternator from a Suzuki Samurai. I also have to change the leaking gas petcocks as well as weld a hairline crack I found on the front end. I'm looking forward to this season. It should be fun. |
||